Western Railway to go for 3-point approach to de-water Vasai-Nallasopara belt
According to the plan, water from areas around the tracks will be drained out using high-powered pumps first. Secondly , to prevent the risk of water flooding the tracks in the future, walls will be built next to the station. As a final step, those areas requiring elevation of tracks will be located.
The decision was taken in the joint-meeting attended by various agencies aimed to find the solution. Image source: Western Railway/ Twitter