Tata Power Renewable Energy to build 43.75 MW solar project for Bajaj Group's Mukand Ltd
Tata Power Renewable Energy Ltd (TPREL) will undertake the construction, operation, and maintenance of the captive solar power plant.
Tata Power Renewable Energy Ltd (TPREL) has inked a pact for building a 43.75 MW captive solar project for Mukand Ltd, a Bajaj Group firm.
Located at Jamkhed in Maharashtra, the installation will generate 99.82 MUs (million units) annually and is expected to offset 54,687 tonne CO2 emissions per year.
As per the Power Delivery Agreement (PDA), TPREL will undertake the construction, operation, and maintenance of the captive solar power plant, Tata Power said in a BSE filing on Friday.
The project is scheduled for commissioning by March 2024.
The plant's primary objective is to fulfil Mukand's energy needs while promoting environment-friendly practices within their stainless steel manufacturing operations.
Get Latest Business News, Stock Market Updates and Videos; Check your tax outgo through Income Tax Calculator and save money through our Personal Finance coverage. Check Business Breaking News Live on Zee Business Twitter and Facebook. Subscribe on YouTube.
RECOMMENDED STORIES
GAIL share price target: Should you buy, sell or hold GAIL shares? Here's what brokerages make of PSU's Q4 results
Top 7 SIP Mutual Funds in 1 Year: What Rs 10,000, Rs 15,000, and Rs 20,000 SIPs have given in each fund
Special Live Trading Session on Saturday: Know why BSE, NSE will remain open on May 18; check timings
If you make RDs of Rs 5,000, Rs 10,000, Rs 15,000, and Rs 20,000 in post office, what will be your maturity amount?
Atal Pension Yojana EPFO National Pension System SWP Retirement Planning schemes provide pension every month
Gold and Silver rate today (May 16, 2024): Yellow metal futures subdued; white metal hits record high breaches Rs 87,000 mark
04:54 PM IST