Mumbai Metro 3 corridor ALERT! MMRC completes 97% tunnelling on Colaba-SEEPZ Metro line
Mumbai Metro Rail Corporation has tunnelled 52.60 km of the 54.50 km double line (up/down), marking nearly 97 percent of the total tunnelling work required, company's Managing Director Ranjit Singh Deol said
Mumbai would get at least 3 new Metro lines which will make commuting much easier besides reducing the load on the city roads and the two highways. Source: Reuters